Skip to content

Building work at Max-von-Laue High School is advancing smoothly

Renovation projects at Max von Laue Grammar School, supervised by the Central Buildings Management of the City of Koblenz, commenced in the year 2023.

Renovation work underway at Max von Laue high school, conducted by the city of Koblenz's central...
Renovation work underway at Max von Laue high school, conducted by the city of Koblenz's central building management since 2023.

Building work at Max-von-Laue High School is advancing smoothly

Got the dish on Max-von-Laue Gymnasium Renovation,Yeah?

I've got the lowdown on all the juicy gossip goin' on at the Max-von-Laue Gymnasium! You might remember back since 2023, it's been undergoing a facelift, sponsored by the Central Building Management of the city of Koblenz. The original plan hit a bump in the road for about a year due to some instabilities in the building's gnarly sloping ceilings. They had to knock those suckers down, and it is safe to say that almost every room in the school felt the aftermath. After investigation, it was found that there were some flaws in the structural and fire safety areas that needed to be fixed. As a result, the facade work had to take a raincheck for a bit.

Now, things are back in full swing! The first phase of facade renovation on the schoolyard is movin' along like a well-oiled machine. You can expect it to wrap up within June. This means the scaffolding will come tumblin' down, freeing up a good chunk of the schoolyard for the students to enjoy.

On the ground floor, some steel construction work has started parallel to the facade renovation. By the end of the summer holidays, they'll finish renovating the roof of the administration there and tear down the auxiliary constructions.

Inside the building, the team is installin' a new ventilation system for the first building section on the third floor. Once that's done, they'll continue this work on the other floors.

In addition to that, they're pushin' ahead with the Digital Pact, aiming for a completion by summer 2025.

Wanna know more about this major construction project? Check it out at www.koblenz-baut.de/mvl. Got questions? Send an email to koblenzbaut@stadt.koblenz.de.

Photo Credit: City of Koblenz/ Mandy Steffens.

Now you're all caught up on the latest news from the Max-von-Laue Gymnasium renovation project! If you're keen on learnin' more about Max von Laue, he was a German physicist who nabbed the Nobel Prize in Physics in 1914 due to his findin' on the diffraction of X-rays by crystals[2]. His ground-breakin' work is still reverberatin' in the scientific community today, influencin' educational programs and research.

The Digital Pact, an education-and-self-development initiative, is pushing ahead with a goal to complete by summer 2025, aiming to enrich the learning experiences for the students at Max-von-Laue Gymnasium. Other than the ongoing renovation activities, Max von Laue's ground-breaking work in the field of physics, particularly X-ray diffraction, continues to influence educational programs and research, fostering a culture of learning within the school.

Read also:

    Latest